Department of National Defense (DND) Green Heat

VC31 Picture
cfb-kingston
int-2
int-1
ext-6
ext-5
ext-4
ext-2
PlayPause
VC31 Picture
cfb-kingston
int-2
int-1
ext-6
ext-5
ext-4
ext-2
previous arrow
next arrow

Client: Department of National Defense

Year: 2023

FVB’s solution was to provide an external heating plant facility that will not only serve the demonstration building but was designed to potentially serve an entire district node of the base. The plant concept consisted of air source heat pumps (ASHP), boosted by water source heat pumps (WSHP) with thermal storage on the low and high temperature loops. Condensing hot water boilers will be used for redundancy, fuel diversity and temperature top-up as required. The thermal storage tanks will allow for the thermal production to shift to times of low grid emissions (e.g. night) and to smooth out times when the ASHPs may be unavailable. There will also be solar PV capacity installed on the existing building’s roof.

The design was completed in 2023 with additional design work completed in early 2024 to future-proof the concept for expanded export capacity. Currently, the project is under construction under a Design-Build venture between FVB and Black & McDonald. Construction is expected to finish in 2025 and the demonstration period will occur over the next two heating seasons following that.

Decarbonize, Design-Build, Thermal Storage, Heat Pumps

Scroll to Top